Renton, Washington
Architect
LMN Architects
Services
Facade construction management
Description
This 5-story structure consists of large floor plates for fluid changes in regard to allocation of floor space. The project is the second phase of a large Boeing campus. The project was development on a “fast-track” basis with duration of 24 months from start from architectural design to move-in by the client.
The facade was designed concurrently with the building and features large curtain wall units with integrated metal cladding, insulated high performance glass and interior trim elements to accommodate electrical distribution. Unique skylighting and high span lobby elements are functional and aesthetic accents to the building.
Services provided in conjunction with The Edifice Group.

No comments:
Post a Comment